Jack Brewster, Super Pro ET
|
| Complete tube chassis and front suspension to fit customer's existing body and back axle |
|
| Looking back from crank shaft position |
|
|
Rear framework with parachute strap attachment point at the back. Axle held in correct position by jig. Suspension and mounts not yet fitted. |
|
|
Existing four-link and a-frame locator re-used |
|
|
Engine in place with ancillaries mounted to front motor plate. Dry sump tank fitted. Body now mounted to chassis. |
|
|
Gearbox mount in place and interior tin-work started with wheel tub inners waiting to be fitted. |
|
|
Door hinge pins fitted and removable front end supports allow quick removal of heads if necessary. |
|
|
Door latch pin mount with frame extension to pick up the bottom of the rear quarter panel and light duty brace to support the top edge.. |
|
|
Frame upside down to allow finish welding and fitting ally floor ..... |
|
|
..... plus rear frame and panels leading into wheel tubs. |
|
|
Last days in the workshop waiting for final body and panel fitting. |
|
|
This picture from the 2011 Euro Finals is © Roger Gorringe and used with permission. Click his name to see more of his pictures. Click Euro Finals burn out to see Jack in action. |
|
| |
| Date | 20-Sep-2011 |
| Pictures by | Roger Gorringe and webmaster |